The pre-procurement phase combines the EEE parts state-of-the-art analysis, risk analysis and component ownership cost optimization with regards to the mission requirements, design criticality and budget.
In order to achieve this, the project manager leading a multidisciplinary team must find the optimal balance between component information availability (traceability, materials, testing, previous useā¦) and minimum tests to perform, reaching an acceptable level of reliability covering the technical, schedule and costing constraints.