FPCN23288X DPAK‐JEDEC 3L Second Source KangQiang Leadframe and Base Material qualification.
General data
Qualify leadframe as second source supplier and the base material C19210 (KFC). Current leadframe base material C14415 is in short supply on the market and lead time 4 months. The purpose of the change is for adding DPAK‐ Jedec 3L alternative source, keep supply chain continuity